Cookies are used on the page.
By visiting this site, you agree to use cookies.

Agree

Lengths of transmission system pipelines

On the grounds of article 171 of Regulations “Regarding the Use of Natural Gas Transmission System” (hereinafter – Regulations) approved with the Decision of the Public Utilities Commission No. 1/16 of 13 April 2017, the operator of transmission system publishes the length of transmission system pipelines from the cross-border transmission system midle point to entrance and exit points specified in subparagraphs 5.1-5.4 and 6.1-6.4 of Regulations.

Regulation (EC) No. 715/2009 of the European Parliament and Council on conditions for access to the natural gas transmission networks and repealing Regulation (EC) No 1775/2005 (hereinafter – the Regulation) and the condition included in article 13 of the Regulation that charges for usage of the transition system shall not be calculated on the basis of contract paths is binding to the joint-stock company “Conexus Baltic Grid” as to the operator of the transmission system.

Transportation system users can familiarize themselves with the news on the homepage https://capacity.conexus.lv/

Atpakaļ